- Stage: S6 synthesis-aligned version (derived from S4 priority ①; outdated labels corrected according to later evidence)
- Written: 2026-11-29 (Asia/Kuala_Lumpur, UTC+8); S6 revision the same day
- Corresponding knowledge entries: K-D05-01 to K-D05-05, K-D06-01 to K-D06-03, K-D11-01, K-D11-02, K-D11-04, C-02/C-03/C-04/C-05
- Status: U1–U11 control tables kept; POME regulatory limits and the water-tube boiler conclusion added; MS 814:2025 / bound full CoPM text and investment by equipment type remain public gaps
- How to read: each process step follows framework template T1–T6. Parameters must carry applicable conditions and evidence numbers. Where the original was not opened, write "unverified / to verify". The consultation draft must not be written alone as a mandatory standard, vendor performance must not be written as an industry benchmark, and conflicting figures must not be averaged.
0. Conventions of use and evidence boundaries
0.1 Official Malay terms
The MPOB Code of Good Milling Practice third-edition training material (2026-04-22, Ipoh) writes fresh fruit bunch as buah tandan segar (BTS), crude oil as minyak sawit mentah (CPO) and palm kernel as isirong sawit (PK) (E-05-09). The earlier "to confirm" status of "tandan buah segar" in the keyword library can be changed to verified in the Malaysian official training context; Indonesian media still often write TBS, which this file does not equate on its own.
0.2 Third-edition CoPM: draft, training material and full text
| Text |
Identity |
Use |
| 2025-08 public consultation draft (E-05-03) |
Draft, grade B |
Can serve as the skeleton of control points; must be labelled "draft" |
| 2026-04-22 MPOB third-edition training slides (E-05-09) |
The authority's official explanation of third-edition clauses, grade A |
Control values overlapping with the draft can be raised to higher confidence; draft details not restated in training must not be promoted to "promulgated provisions" |
| Third-edition bound official PDF / full clause text |
S4 still found no freely accessible official full text; POMREQ 2026 news says it was officially launched/published (E-08-05). Control values still rely on the training + draft cross-check |
Gap: official clauses |
| 2026 certification procedure material (E-05-10) |
MPOB explained certification arrangements on 2026-04-21 |
See the next paragraph: CPO is listed as food by the Ministry of Health and PJKM is a regulatory requirement, but the CoPM certification scheme is implemented as voluntary from 2026-01-01; see conflict C-04 |
Detailed values present in the draft but not restated in the 2026 training, which this file records only as "recorded in the draft, pending check against the official full text": digester fill level at least 3/4; pure oil tank ≤90°C; kernel drying ≤70°C, moisture ≤7%; dirt in shell–kernel separation ≤6%; CPO heating for dispatch ≤5°C per 24 hours (≤25°C with an agitator). Control values restated in training that can be cross-checked with the draft: USB <5%; digested mash 85–95°C; clarification 85–95°C; CPO short-term storage 40–55°C, long-term ambient temperature; magnetic trap/filter before the storage tank; M&I cites MS 814, kernel specification cites MS 236; the specific gravity of the clay bath must be monitored, and the clay must not be coral-based.
The 2026-04-21 certification procedure training also states: the Ministry of Health (KKM) lists CPO as food; the Food Hygiene Regulations 2009 under the Food Act 1983 require the owner/occupier of food processing premises to have a food safety assurance programme (PJKM). Existing PJKM certifications (HACCP, GMP, MeSTI) are not designed specifically for palm oil mills; KKM has recognised the CoPM certification scheme as equivalent to PJKM. At the same time, the material states clearly that the CoPM certification scheme is implemented by MPOB as VOLUNTARY from 2026-01-01; the application audit fee is listed in that material as RM 6,000/audit (E-05-10). When writing, do not simplify to "from 2026 all mills must hold a CoPM certificate", nor write "mills have no food safety programme obligation". Per the user's instruction, "voluntary certification but substantively equivalent to KKM/PJKM, a de facto threshold for those selling to mills" is treated as an [Inference] (conflict C-04, see K-D08-02). The full official recognition letter has still not been opened.
The texts of MS 814:2025 and MS 236 were not opened (paywall not bypassed). The only limit cited in this file is: in the context of "washed CPO", the training material says chloride must be controlled per MS 814, not exceeding 2 ppm, to reduce 3-MCPDE risk (E-05-09). The 2025-edition values for FFA, routine M&I, DOBI, etc. have still not been opened (PORAM domestic contract specifications see K-D04-02; the paraphrased MS 814:2007 table see E-08-06, which must not automatically be taken as the 2025 limits).
0.3 Oil-loss benchmarks and reverse searching
The frequently cited "total milling oil loss of about 1.77% (to FFB)" comes from the approximation of Ng (1993) (cited in E-05-13). POEB 103's measurements at several mills are often higher than this approximation; POEB 108 gives another set of mill worked examples. 1.77% must not be written as the current typical or good-mill level. See conflict C-02.
Continuous sterilization: "significantly raises OER" is common in later reviews. After opening the Sivasothy (2006) original: some mills had better OER than neighbouring mills, while some comparisons showed no advantage; KER was low early on and needed improvement through nut drying and reducing kernel losses; the trade-offs include a higher rate of broken nuts in press cake. See conflict C-03.
0.4 Investment amounts
A complete investment comparison table by equipment type (horizontal/vertical/spherical/continuous, etc.) still has insufficient public information after the S4 follow-up searches (K-D06-02). This file only records opened listed-company disclosures: the Kim Loong Resources annual report (FY2026 ended 2026-01-31) confirms a fourth mill of 60 t FFB/h under construction at Pantu, Sarawak, expected to start operating in about two years; the annual report does not give the mill's total investment (E-05-16). The broker's "about RM100 million" does not appear in the company's annual report and is not written into knowledge entries. The Anglo Eastern official page was blocked by a captcha; the URL of an Indonesian company's groundbreaking press release returned a web page rather than a readable PDF; neither is adopted. Vendors' US-dollar cost ranges are not used as industry benchmarks.
0.5 Experience cross-check
This round's control points have been cross-checked between CoPM and MPOB/JOPR/POEB literature. Experience cross-checks against forums, vendor application notes and job descriptions were not set up as a separate item within this priority, and unopened operator accounts are not written into the tables below.
U1 Fruit reception, grading and cage charging / conveying (FFB reception, grading, charging)
T1 Purpose. Accurately weigh incoming BTS/FFB, grade per the current manual, buffer first-in-first-out, and feed bunches to the sterilization station; reduce the FFA rise caused by loose fruit on the ground, mixing and delays.
T2 Types. Two common routes (E-05-03, E-05-04, E-05-09): ① FFB ramp → hopper / cage charging → cages pushed into batch sterilizers; ② conveyors feeding directly from the hopper into continuous, tilting, spherical or vertical sterilizers (draft: these generally do not use cages). The 2026 training states: BTS enter cages from the hopper; conveyors must be clean and serviceable; spilled fruit must be picked up immediately.
T3 Control parameters (with conditions).
| Point |
Value or requirement |
Condition / source |
Confidence |
| Weighbridge |
Must be calibrated and clean, indicator visible and working, seals and records kept |
CoPM 2026 training 4.2 (E-05-09) |
High (official training) |
| Grading |
By qualified graders, per the current MPOB "Oil Palm Fruit Grading Manual" (listed in training and draft references as the 2015 third edition) |
E-05-09, E-05-03 |
High (manual text not opened this round; stated as "per the current manual") |
| Stockpiling |
Clean platform, FIFO |
E-05-09 |
High |
| Time limit from arrival to processing |
The USDA FAS country note says FFB should be processed within 24 hours |
E-03-05, grade B, and not a provision of the Malaysian code of practice |
Medium; must not be written as a CoPM limit |
T4 Inspection. Weighbridge records, grading records, seals; visual check of platform and conveyor hygiene and whether spilled fruit is recovered promptly.
T5 Abnormalities. Delays or overripe/unripe fruit raise FFA and lower extractable oil; lax grading can misdiagnose quality problems as mill oil loss. POEB 103 lists fruit quality, climate, etc. as factors hard for the mill to control alone, and equipment and operating efficiency as controllable factors (E-05-13).
T6 Upstream/downstream. This station determines the subsequent sterilization load and the starting point of CPO quality; the cage vs conveyor route determines U2 equipment selection. Investment: a separate public cost for this station is unverified.
U2 Sterilization (sterilization / pensterilan)
T1 Purpose. Deactivate lipase, loosen fruitlets, soften the mesocarp and condition the nuts, so that unstripped bunches (USB) after threshing are controllable and conditions are created for digestion and pressing (E-05-03, E-05-04).
T2 Verified mainstream or reported commercial types (no new "mainstream" types invented).
| Type |
Structure / feeding points |
Steam conditions (opened sources) |
Adoption (time point stated) |
Source |
| Horizontal / conventional batch |
Cages pushed into a horizontal cylindrical pressure vessel |
Literature commonly gives about 40 psig, 60–90 min; single / double / triple peak cycles used to purge air. Steam consumption (Sivasothy, 1986, cited via AOCS): single peak about 140 kg/t FFB, triple peak about 224 kg/t FFB (40 psig) |
Long-standing mainstream |
E-05-04; the original 1986 paper was not separately opened this round; steam figures are cited |
| Vertical |
Mostly fed by conveyor, no cages (draft) |
No independent vertical-specific pressure/cycle table opened this round |
JOPR and others have adoption statistics, partly citing unpublished data; must not be written as an official census |
E-05-01/03 (existing cards) |
| Tilting |
Conveyor-fed; can tilt to discharge |
See the Loh feature, vendor background |
Type in use, cross-checked |
E-05-07 |
| Spherical |
Conveyor-fed |
No spherical-specific parameter table opened this round |
Type exists |
E-05-01, E-05-03 |
| Continuous |
Usually double-roll crushing first, then sterilization with low-pressure or atmospheric live steam on a conveyor line; cages and cranes eliminated |
Low-pressure / atmospheric live steam (not a 40 psig batch vessel) |
Sivasothy (2006) writes that at the time of writing Malaysia had 16 in use and another 3 under construction — this is the time point of about 2005/06, not a 2024–2026 census |
E-05-11, E-05-12 |
| Indexer |
Listed in the framework as an observed type |
Structure and parameters still thin this round; insufficient public information |
The title is not treated as a verified process package |
— |
| J-Sterilizer |
Introduced in POEB 148 as a commercial type beyond horizontal/vertical/tilting/spherical (Sawipac) |
Performance mostly conference/vendor data |
Can be listed as a type, grade C, original report to be traced |
E-06-01 |
| Inclined, steamless, etc. |
Framework: non-mainstream |
Not used as a comparison baseline in this table |
— |
— |
Steam cycles (single/double/triple peak) are operating regimes of batch vessels, not separate "equipment types".
T3 Control parameters.
| Point |
Value or requirement |
Condition / source |
Confidence |
| USB |
CoPM: per SOP, USB <5% |
2026 training consistent with the 2025 draft (E-05-09, E-05-03). POEB 103 also records that MPOB once specified a 5% tolerance (E-05-13) |
High (code-of-practice target, not a physical law) |
| An example of a continuous mill |
Bukit Puteri 2005-07: USB 2.97%; OER 20.91%; KER 5.17%; throughput 15.90 t FFB/h |
Single mill, single month; cannot be extrapolated as a guaranteed value for continuous types (E-05-11) |
Medium (original paper, but narrow sample) |
| Batch vessel pressure / time |
About 40 psig, 60–90 min (review) |
Conventional horizontal; not applicable to continuous types (E-05-04) |
Medium-high (review/industry general account) |
| Steam consumption |
140–224 kg/t FFB (single peak → triple peak, 40 psig) |
Cited from 1986 literature; higher consumption figures in other literature not opened this round, not averaged alongside |
Medium |
| Condensate |
Measures must be taken to reduce adverse effects on CPO quality; the draft allows blending back but with quality control |
E-05-09, E-05-03 |
High (principle) |
| Condensate oil loss |
Ng (1993) approximation 0.10% (to FFB); POEB 103 several mills 0.08%–0.35% (converted at condensate/FFB≈20%); POEB 108 worked example 0.16% |
See C-02 |
Medium (varies with sampling and conversion ratio) |
T4 Inspection. USB count or weight proportion (per mill SOP); sterilization cycle records (pressure, time, number of venting peaks); condensate sampling (POEB 103: from the condensate outlet to the pit). Whether spilled fruit is recovered.
T5 Abnormalities. High USB: under-sterilization, over-packed cages, poor cycles or venting, directly increasing oil carried into empty bunches and adding recycling. Early problems with continuous types include low KER and higher nut breakage in press cake (E-05-11). High condensate oil loss lowers OER and may affect oil quality.
T6 Upstream/downstream. Under-sterilization → more USB and recycling at U3; excessive treatment or crushing in continuous types → may change nut breakage in pressing and kernel recovery. Eliminating cages can reduce leaks and labour, but changes the steam balance (U10) and nut conditioning (U8). Investment: cost by equipment type unverified this round (Anglo official page failed).
Reverse-search conclusion (C-03). "Continuous sterilization always significantly raises OER" cannot be written as an unconditional fact. Sivasothy (2006) Table 3: Bukit Puteri's 2005-06 OER of 21.98% was higher than some of the neighbouring mills listed; Table 4: Ladang Pasir Besar's OER of 20.02% was not better than all neighbouring comparison mills. The authors also emphasise benefits in safety, labour, elimination of cages and cleanliness. Later reviews that excerpt only "OER significantly raised" are over-generalising.
U3 Stripping / threshing (stripping / threshing / peleraian)
T1 Purpose. Separate sterilized fruitlets from the empty fruit bunch (EFB), minimising USB and oil absorbed on the empty-bunch surface.
T2 Types. The rotary drum thresher is the verified conventional type (E-05-04). Hard bunches are recycled after visual inspection. The 2026 training emphasises: parts in contact with BTS must avoid mineral oil / grease contamination.
T3 Control parameters. USB <5% is the joint result of sterilization + threshing, not a guaranteed value of the thresher alone. Ng (1993) approximation: USB oil loss 0.05%, fruit in empty bunches 0.02%, oil absorbed on the empty-bunch surface 0.45% (to FFB). POEB 103: measured empty-bunch oil loss about 0.59%–1.31%, often higher than the 0.45% approximation; it suggests this may be related to under-sterilization, poor drainage of cages or digesters, etc. (E-05-13). POEB 108 worked example: empty-bunch oil loss 0.56% (E-05-14).
T4 Inspection. Sampling for USB, fruit in empty bunches and oil in empty bunches; visual check of recycled bunches.
T5 Abnormalities. High USB or oil in empty bunches: first recheck U2 cycles and drainage, rather than just raising thresher speed (no independent opened data on speed optimisation this round; to verify).
T6 Upstream/downstream. Threshing quality determines the integrity of fruitlets entering U4; EFB goes to waste handling and the fibre boiler (U10/U11). Investment: to verify.
U4 Digestion and screw pressing (digestion and screw press / pencernaan dan skru pemerah)
T1 Purpose. Rupture mesocarp cells and condition temperature in steam-heated, agitated digesters, then separate an oil-bearing liquor and press cake (fibre + nuts) through screw presses.
T2 Types. Steam-heated digester + screw press; the design can be single-stage, or with second pressing of cake fibre (E-05-04). Presses and digesters are usually supplied as a set.
T3 Control parameters.
| Point |
Value or requirement |
Condition / source |
Confidence |
| Mash temperature |
85–95°C |
2026 training consistent with the draft (E-05-09, E-05-03) |
High |
| Fill level |
Draft: at least 3/4; AOCS review says "keep full" |
The 2026 training does not restate 3/4; must not be written as a promulgated mandatory provision |
Medium (draft/review) |
| Drainage |
The digester drainage system must be fully serviceable |
E-05-09 |
High |
| Hygiene |
Mineral-oil leaks at digesters, press gears and screws must be cleaned up immediately |
E-05-09 |
High |
| Press-cake fibre oil loss (to FFB) |
Ng approximation 0.55%; POEB 103 several mills 0.53%–0.63%; IJBR review 0.45%–0.76% |
All are literature ranges to FFB, not single-mill guaranteed values |
Medium |
| An example of press oil content (dry basis) |
Bukit Puteri 2005-07: oil loss in two screw presses (OCDB) 9.03%, 8.96%; nut breakage in press cake about 24% |
Single mill; the authors suggest lower oil loss may come at the cost of higher nut breakage (E-05-11) |
Medium (narrow sample) |
T4 Inspection. Mash temperature; whether drainage is clear; press-cake oil content (state wet/dry basis and whether converted to FFB); nut breakage rate; patrols of leak points.
T5 Abnormalities. Low temperature or poor agitation/drainage → higher press oil loss. Excessive press pressure may increase nut breakage, shifting the problem to kernel loss at U8 (E-05-11, E-05-15). Mineral-oil contamination is a food-safety matter (training requires engineering controls to prevent MOSH/MOAH; H1 food-grade grease is encouraged).
T6 Upstream/downstream. Press liquor goes to U5; press cake goes to fibre separation (U8) and boiler fuel (U10). Second pressing changes fibre oil loss and power consumption; public comparison data are insufficient this round.
U5 Clarification and sludge oil recovery (clarification / penjernihan)
T1 Purpose. Separate oil in the press liquor from water and fibre debris, recover oil from the underflow, and send cleaner oil to purification.
T2 Types. Conventional: hot-water dilution, vibrating screen, continuous settling tank (CST), with the top layer going to purification and the bottom layer recovered by sludge centrifuges and/or decanters (E-05-03, E-05-04). Some mills replace or supplement the settling tank with decanters; the review says maintenance costs are higher but it helps reduce POME (E-05-04, 2019 wording).
T3 Control parameters.
| Point |
Value or requirement |
Condition / source |
Confidence |
| Process temperature |
85–95°C (clarification process) |
2026 training (E-05-09). The draft also gives 85–95°C for clarification and sludge tanks; the AOCS review gives settling at 85–90°C for 1–3 hours — the temperature bands differ slightly; the CoPM training's 85–95°C is primary, and the review serves as an operating description |
High (temperature band); residence time only Medium |
| Settling tank cleaning |
Sediment must be cleaned out frequently |
E-05-09 |
High (principle) |
| Sludge oil loss (to FFB) |
Ng approximation 0.45%; the IJBR review gives about 0.32%–0.60% in sludge; POEB 103 records that some mills could not reach the 0.45% approximation |
See C-02 |
Medium |
| An example of a continuous mill |
Bukit Puteri 2005-07: oil loss in three sludge centrifuges (OCWB) 0.84%, 0.91%, 0.99% |
Units are oil content (wet basis), not a percentage of FFB; cannot be compared directly with 0.45% |
Medium |
| Blend-back prohibition |
Sludge oil and solvent-extracted oil must not be blended back into CPO (consistent with MPOB circulars) |
E-05-09 |
High |
T4 Inspection. Temperature; underflow/sludge oil content (state units); settling tank cleaning records; whether sludge oil is blended back.
T5 Abnormalities. Improper temperature or dilution, poor screen or settling efficiency → oil goes to the underflow, OER falls, POME load rises. Blending back sludge oil is prohibited by the code and affects food safety and traceability.
T6 Upstream/downstream. The clear supernatant goes to U6; sludge and wash water are an important source of POME (U11). Investment: the cost difference between decanters and settling tanks is unverified this round.
U6 Purification and vacuum drying (purification and vacuum drying / penulenan)
T1 Purpose. Further reduce moisture and impurities (M&I) and prevent iron particles and the like from entering storage tanks, so that CPO meets contract/standard specifications.
T2 Types. Purifier centrifuge + vacuum dryer is the verified conventional combination (E-05-04). Some mills also have CPO washing to produce premium "washed CPO".
T3 Control parameters.
| Point |
Value or requirement |
Condition / source |
Confidence |
| M&I |
Per MS 814 "Palm Oil – Specification" |
Cited in both training and draft; 2025-edition values not opened (contract specifications see K-D04-02) |
High (must comply with the standard); values unverified |
| Pure oil tank temperature |
Draft: ≤90°C |
Not restated in the 2026 training |
Pending the official full text |
| Magnetic trap / filter |
Must be installed before the CPO storage tank to prevent iron contamination |
E-05-09, E-05-03 |
High |
| Chloride in washed CPO |
Training says: must be controlled per MS 814, not exceeding 2 ppm, to suppress 3-MCPDE; and says it is deemed satisfied if the buyer accepts |
E-05-09. The standard's text was not opened this round; this is the official training's paraphrase of the standard |
Medium-high (paraphrase, pending check against the standard's original) |
| A single-mill quality example |
Bukit Puteri 2005-07: FFA 4.25%, volatile matter 0.090%, impurities 0.004% |
Historical single mill, not a specification |
Example only |
T4 Inspection. The laboratory measures M&I etc. by recognised methods; magnetic trap cleaning records; if washing is done, monitor chloride. The laboratory must also meet training 4.7 (cross-checks, food analyst qualifications, etc.).
T5 Abnormalities. Oil with M&I over the limit cannot be dispatched; iron contamination affects storage stability; excessive chlorine residue after washing increases 3-MCPDE risk. Sludge oil or solvent-extracted oil must not be blended back to "improve" specifications (see U5).
T6 Upstream/downstream. Conforming oil goes to U7. Specification disputes link directly to contracts and MS 814 (priority ②).
U7 CPO storage and dispatch (storage and dispatch)
T1 Purpose. Store CPO under controlled temperature and hygiene conditions, prevent oxidation, contamination and overflow, and dispatch FIFO.
T2 Types. Storage tanks (must be cleaned regularly, recalibrated where needed, labelled for identification); high-level alarms or level gauges (E-05-09, E-05-03).
T3 Control parameters.
| Point |
Value or requirement |
Condition / source |
Confidence |
| Short-term storage temperature |
40–55°C, heated per SOP |
2026 training consistent with the draft (E-05-09, E-05-03) |
High |
| Long-term storage |
Ambient temperature (heating off) |
Same as above |
High |
| Heating rate for dispatch |
Draft: ≤5°C per 24 hours; ≤25°C with an agitator; agitate when draining daily or dispatching |
The 2026 training does not restate the rate |
Pending the official full text |
| Quality monitoring |
Monitor and record oil quality daily |
E-05-09 |
High |
| Transport |
FIFO; carrier vehicles must be registered under the MPOB 2005 licensing regulations; no mixed loading with other products; sample per contract specifications before dispatch; seals; MPOB L3 form for each batch and notify MPOB |
E-05-09 |
High (Malaysian licensing system) |
T4 Inspection. Tank temperature and level; daily quality report; seals and L3 records.
T5 Abnormalities. Overheating or repeated heating damages quality; prolonged improper storage raises FFA / oxidation risk; tank overflow and mixed loading are code and safety incidents.
T6 Upstream/downstream. The receiving end is refining or trading, outside the main scope of this knowledge base; only the interface is kept. Tank farm investment not separately verified.
U8 Kernel plant: fibre separation, nut cracking and shell–kernel separation (kernel plant)
T1 Purpose. Separate fibre and nuts from press cake, crack nuts and separate kernel from shell, controlling dirt content, broken kernels and kernel loss.
T2 Types. Verified combination (E-05-04, E-05-03): depericarper column + polishing drum → nut drying/conditioning → nut cracker or ripple mill → winnowing, followed by hydrocyclone or clay bath; there is also MPOB's four-stage dry winnowing (existing framework source; parameters from unopened dedicated papers are not developed in this file). One continuous mill example also uses a ripple mill (E-05-11).
T3 Control parameters.
| Point |
Value or requirement |
Condition / source |
Confidence |
| Nuts on the ground |
Must be picked up and reprocessed via the nut conveyor or disposed of as specified |
E-05-09 |
High |
| Cracking |
Carried out at the target rate of "minimum breakage" |
Qualitative training requirement; no quantitative speed table |
High (principle) |
| Clay bath |
Monitor and record specific gravity regularly; the clay must not be coral-based, and heavy metals and dioxins must be avoided |
E-05-09, E-05-03 |
High (principle); target specific-gravity value not given in training |
| Dirt content |
Dirt content must be monitored after separation; the draft once gave a target dirt content of ≤6% |
6% is draft only, pending the official full text |
Monitoring High; 6% to verify |
| An example of a continuous mill (2005-07) |
Ripple mill cracking efficiency 97.35% / 98.18%; kernel loss in cyclone fibre 2.20%; wet shell 2.36%; dry shell winnowing 1.55% / 0.96%; production kernel dirt 4.19%, volatile matter 5.09%, broken kernels 28.56% |
Single mill, single month (E-05-11) |
Medium |
T4 Inspection. Specific-gravity records, dirt content, cracking efficiency, kernel loss in each waste stream, proof of clay origin.
T5 Abnormalities. Nuts too wet or too dry both reduce cracking efficiency; excessive nut breakage at the pressing station (see U4) shows up in this station as more broken kernels and kernel loss. Poor clay-bath management carries food-safety and contamination risks.
T6 Upstream/downstream. Kernels go to U9; shell and fibre go to U10 as boiler fuel. If nut conditioning is insufficient under continuous sterilization, the problem is amplified at this station (E-05-11).
U9 Palm kernel drying and storage (kernel drying and silos)
T1 Purpose. Dry kernels to a moisture level safe for storage and delivery, and control dirt and oil content to specification.
T2 Types. Hot-air silo drying is the verified conventional type (E-05-04).
T3 Control parameters.
| Point |
Value or requirement |
Condition / source |
Confidence |
| Temperature and time |
Must be controlled; silos must be cleaned regularly |
E-05-09 |
High (principle) |
| Specification |
Drying temperature and quality controlled per MS 236 "Palm Kernels – Specification" |
E-05-09 |
High (must comply with the standard) |
| Draft detailed values |
Drying temperature ≤70°C, moisture ≤7%, citing MS 236; the AOCS review also says drying to below 7% moisture |
The figures 70°C and 7% are not restated in the 2026 training; 7% has a review cross-check, still pending the opening of MS 236 |
Medium |
| Storage quality |
Monitor dirt, moisture, oil; non-conforming kernels quarantined under the non-conforming product procedure |
E-05-09 |
High |
T4 Inspection. Silo temperature, moisture, dirt content, oil content; cleaning records.
T5 Abnormalities. Overheating damages oil quality or increases broken kernels; high moisture is unfavourable for storage. Non-conforming batches must not be mixed into conforming silos.
T6 Upstream/downstream. Dispatched PK goes to kernel crushing or trading. National KER benchmark per MPOB: 4.64% in 2024 (E-06-01); Kim Loong FY2026 group kernel recovery 4.93%, against a national 4.67% (E-05-16; when the national figure is shown alongside the MPOB basis, the year source must be labelled).
U10 Steam, boiler and CHP (utilities, boiler, CHP)
T1 Purpose. Raise process steam from biomass such as press fibre and shell, generate power or co-fire biogas where needed, support sterilization and heating, and handle pressure-vessel safety.
T2 Types. Fibre + shell biomass boilers, combined heat and power, and biogas co-firing are reported routes (E-05-08, etc.). POEB 116 (Menon, E-06-03) reviews that early fire-tube boilers have been widely replaced by water-tube boilers, to suit biomass fuels such as fibre and shell and larger evaporation capacity. This is a historical and industry-evolution narrative, not a selection calculation for any mill. Continuous sterilization switches to low-pressure/atmospheric steam, which changes the steam balance, but does not mean boiler safety requirements can be omitted.
T3 Control parameters. Sterilization steam quantities see U2 (conventional batch, cited 140–224 kg/t FFB). The 2026 training 4.10 requires compliance with the Occupational Safety and Health Act 1994 and employment-related acts; the draft's references list the F&M (Steam Boilers and Unfired Pressure Vessels) Regulations 1970 — specific inspection intervals and allowable pressures were not opened in the regulatory text this round. Kim Loong's annual report gives operating intensity examples: FY2026 water use 1.3 m³ per tonne of FFB, greenhouse gas captured 17.52 m³/t FFB (E-05-16); these are a single listed company's annual intensities, not design norms.
T4 Inspection. Statutory inspection of boilers and pressure vessels (provisions to be opened); steam pressure/flow; fuel moisture and mix ratio (no uniform opened norm this round).
T5 Abnormalities. Insufficient steam directly disrupts U2 cycles; water quality and ash fouling affect efficiency and safety. "Biomass fuel is free" must not be written as cost-free — collection, drying and furnace condition all consume operating resources (qualitative, pending dedicated literature).
T6 Upstream/downstream. Serves U2/U4/U5/U7/U9; ash and flue gas fall under environmental management (U11/D11). Investment: Kim Loong FY2026 capex for the existing milling business was RM22.34 million, for equipment upgrades and replacement, not the cost of a new whole mill (E-05-16).
U11 POME and waste (effluent and waste)
T1 Purpose. Identify and lawfully handle general waste and scheduled waste, control palm oil mill effluent (POME) discharge, and recover by-products (biogas, sludge) where appropriate.
T2 Types. Reported: pond systems (including aerobic), covered ponds or digesters capturing biogas, and some tertiary treatment; there are also conference proposals such as evaporation (E-05-04, E-06-01). Conference proposals must not be written as widely adopted technology.
T3 Control parameters.
| Point |
Value or requirement |
Condition / source |
Confidence |
| Discharge (training) |
Must comply with the parameters permitted by the relevant acts; waste managed by competent persons |
E-05-09 |
High (must be lawful) |
| Malaysian watercourse (federal) |
BOD limit amended in 1982 to 100 mg/L; also pH, suspended solids, oil and grease, etc., per the schedules of the 1977 regulations and the 1982 amendment |
E-11-06, E-11-07; K-D11-01 |
High |
| Malaysian land application |
BOD normally 5,000 mg/L (regulation 13 of the 1977 regulations); the watercourse standard must not be applied to land |
E-11-06 |
High |
| Stricter Sarawak BOD |
20 mg/L is a regional licence condition, not a federal amendment |
E-11-08 |
High |
| Licence fees (1977 Third Schedule) |
From 1979-07-01: land $50 per thousand metric tonnes of effluent; watercourse $10 per metric tonne of BOD load. DOE 2023 presentation's land "by BOD load" shown alongside the schedule |
E-11-06, C-05, E-11-08 |
High (schedule prevails) |
| Indonesia Permen LH 5/2014 |
BOD5 100 mg/L, COD 350 mg/L, etc.; maximum effluent volume 2.5 m³/t CPO; local/subsequent revisions not systematically checked |
E-11-09; K-D11-02 |
High (for that ministerial regulation) |
| Raw effluent generation |
AOCS review: on average about 0.65 t raw effluent / t FFB (2019 wording); Kim Loong FY2026: 0.63 t POME / t FFB processed (0.61 in FY2025) |
Bases may not be fully identical ("raw effluent" vs company-disclosed POME) |
Medium (same order of magnitude, not averaged) |
| Example calculation |
In discussing an evaporation proposal, POEB 148 uses as an example a 60 t/h mill processing 360,000 t FFB per year |
The operating-hours assumption belongs to that example, not a statutory utilisation rate |
Calculation condition only |
T4 Inspection. Monitor BOD/COD and other parameters per the mill's licence and the above regulations; waste inventory and scheduled-waste transfer records.
T5 Abnormalities. Discharge over the limits is illegal; poor clarification efficiency adds effluent load (U5).
T6 Upstream/downstream. Biogas can return to U10 for co-firing. Chinese imports/refining are outside the scope of this process step.
Cross-step comparison: oil losses and mill efficiency (for OER diagnosis, not a substitute for fruit quality)
Ng (1993) approximation (to FFB, cited via POEB 103 Table 3): USB 0.05%, fruit in empty bunches 0.02%, oil absorbed on the empty-bunch surface 0.45%, condensate 0.10%, press-cake fibre 0.55%, separator sludge 0.45%, total 1.77% (E-05-13).
POEB 103 (Adzmi et al., measurement and policy context of about 2010–2011): mills are classified by total oil loss as good (<1.3%), average (1.3%–1.8%), poor (>1.8%); in measurements at several mills, empty bunches 0.59%–1.31%, fibre 0.53%–0.63%, condensate 0.08%–0.35%, and some sludge and USB measurements were also higher than the 1993 approximation. The paper mentions an oil-loss survey of 217 mills; details follow the original charts. It also records the 5% USB tolerance (E-05-13).
POEB 108 (Othman Walat and Ng Say Bock) worked example: condensate 0.16%, empty bunches 0.56%, total oil loss 1.93%, OER 20.80%, total oil 22.73%, oil extraction efficiency 20.80/22.73≈92% (E-05-14). This is an in-paper worked example, not a national average.
Literature ranges given by the IJBR 2020 review: condensate about 0.07%–0.64% / FFB, press-cake fibre about 0.45%–0.76% / FFB, sludge about 0.32%–0.60% (E-05-15).
Diagnostic principle. National or group OER (Malaysia 19.74% in 2025, 19.67% in 2024, E-03-01; Kim Loong FY2026 group 20.80%, E-05-16) is affected by both fruit quality and mill efficiency; the oil-loss table alone cannot "explain" a given national year-on-year change.
Investment and scale (this priority can only get this far)
- Verified project under construction: Kim Loong's fourth mill, designed for 60 t FFB/h, Pantu, Sarawak; construction had started at the time of the annual report, with operation expected in about two years. The existing three mills total 295 t FFB/h, with a claimed annual capacity of up to 1.80 million t; FY2026 actual throughput was 1.65 million t FFB, producing 342,720 t of CPO (E-05-16).
- Not written in: the total investment of the mill under construction; CSRA / PTPN / Anglo and others, because the originals could not be opened or were only second-hand summaries; vendor quotation ranges.
- At the end of S4: investment by equipment type/whole mill still marked as insufficient public information; EIAs and some papers failed to open, so no range is fabricated (K-D06-02).
This file's coverage of must-answer P0-05-9 and gaps
Covered: main types for U1–U11, official operating control points, conditional quantities for oil loss and USB, the evidence boundary of continuous vs batch, storage temperature bands, food safety (no blending back of sludge oil, magnetic traps, the training paraphrase on chlorine in washed oil).
Gaps remaining at S6: full-text limits of MS 814:2025 / MS 236; whether the draft details are retained in the official bound clauses of CoPM third edition; complete pressure-cycle tables and investment by equipment type; dedicated parameters for indexer / spherical / vertical types; verifiable experience originals in open forums. POME statutory limits have been written into U11, K-D11-01/K-D11-02 and 07_Standards_and_Regulations_List.md. The experience cross-check is in 03_Practical_Experience_Handbook.md and K-D13-02.